Wednesday, 16 November 2022

𝘌𝘯𝘨𝘪𝘯𝘦𝘦𝘳𝘴 𝘛𝘳𝘢𝘷𝘦𝘭 𝘋𝘪𝘢𝘳𝘺 : My Visit to Proposed site of Jabori Hydropower (10.2 MW)

Larpandi Suchan, Jabori, Manshera

May 7, 2014 

The project layout is planned on the right bank of the Siran river which is a tributary of the Indus river. The project consists of several basic parts; civil works and mechanical works. The civil works include the diversion and collection of water from the river through the intake, tunnel, surge tank, and penstock. The diversion weir is located at the shortest possible width of Siran river, where a tyrolean weir is proposed to be constructed. The powerhouse is located on the right bank of the river Siran.