Friday, 24 March 2023

𝐓𝐇𝐄 𝐇𝐈𝐒𝐓𝐎𝐑𝐈𝐂𝐀𝐋 𝐊𝐀𝐋𝐀𝐁𝐀𝐆𝐇 𝐑𝐀𝐈𝐋𝐖𝐀𝐘 𝐁𝐑𝐈𝐃𝐆𝐄 𝐎𝐅 𝐁𝐑𝐈𝐓𝐈𝐒𝐇 𝐄𝐑𝐀 1927

24th February 2018







Kalabagh Bridge is a historic bridge located in the Punjab province of Pakistan, spanning over the Indus River near the town of Kalabagh. The bridge was constructed during the British colonial era in 1927-28 to connect the districts of Mianwali and Dera Ismail Khan.

The bridge was designed by Sir Alexander Rendel, a British engineer who was also responsible for the construction of other notable bridges in India, including the Lansdowne Bridge in Sukkur and the Godavari Bridge in Rajahmundry.

At the time of its construction, the Kalabagh Bridge was considered to be a major engineering feat, as it was one of the longest bridges in the region, with a total length of 1,300 meters. The bridge consisted of 14 spans, each measuring 91 meters in length, and was built using reinforced concrete.
























HISTORY FROM THE ARCHIVES 

The construction of a bridge over the Indus at or near Kalabagh was considered for many years. So the first surveys were carried out in 1888 followed by an investigation from 1919 to 1924. Finally, in 1927 the project costing Rs. 40.36 lac was approved for construction. No provision for the roadway was made. The bridge carried a single-line broad gauge railway.

The bridge will connect the broad gauge (5-6″) system of the railway on the east of the Indus with narrow gauge (2_6″) to the west. With the completion of the bridge, an alternative and direct route is available from Lahore to Waziristan. Commercially and strategically the bridge will play an important role.

The site of the bridge is about 1.25 miles below the gorge from which the Indus emerges into the plains) the course of the river at this site is stable. The character of the river bed at this site is such that from the left (Mari) bank half the width of the bed consists of an uppermost layer of fine sand covering a layer of coarser and sharper sand with small pebbles. The uppermost layers of sand disappear as the deep water channel is unapproached. Below this is a compact stratum averaging 45″ thick of boulders set hard in the sand. The bed of the deep water channel in the other half of the river consists of loose pebbles and boulders above the compact boulder bed. An alternative proposal of a combined weir for Thal canal head works and a railway bridge was earlier rejected mainly because the site of the weir would be 4500′ long instead of 2500′ at the adopted site.

The Punjab irrigation records showed that an extraordinarily high flood occurred in the year 1878, which was calculated as from 757,000 to 770,000 cusecs. For the design of the bridge, the maximum flood was taken as 8 lac cusecs. But there occurred in 1929 a flood of higher magnitude during the currency of work and the help at the bridge site rose to 705.3′. It. Was estimated as 12,00,000 cusecs.

The design was changed accordingly, adopting 12 lac cusecs as peak flood discharge. Waterway provided initially consisted of 9 spans of 250′ clear (263′ center to center of piers). After the flood of 1929, it was decided that the bridge should be extended to cover the full width of the river between the Mari and Kalabagh banks. This entailed an extension of the bridge at the Mari end by 4 spans of 175’_4″ c/c. Girders of standard m.l. 1926 (for 22.5-ton axle loads and a train of 2.3 tons per foot run behind the engine) are designed to carry a single broad gauge line of railway. The live load is carried directly on an open flooring of cross girders and stringers by n-type trough trusses with curved top chords and eight sub-divided panels, the maximum depth of the truss being 30-7.5″. The load is transmitted to the piers through knuckle bearings. Temperature and elastic extension are provided for by roller bearings at one end of each span, there being one pair of fixed and one pair of roller bearings on each pier. Piers was initially designed to be made of concrete blocks but later it was intended to construct mass concrete 1:2.5:5 to avoid handling of blocks. Piers will rest on 2 feet-thick 1:2:4 reinforced concrete base keyed to the top of wells. The maximum intensity of pressure at the base of the pier is 9.5 tons per square foot.

The wells were of twin octagonal type 38′-3″ long by 22′.1.5″ wide. The steining is 6 11.75″ thick, leaving two circular dredging holes each 8 2″ in diameter. The depth of wells fixed were those considered probable safe depths. Deep water wells were taken 40ft into the boulder stratum leaving 36 ft of the well and pier exposed at high flood levels. As some of the wells had to be sunk in deep water and as it was considered that pneumatic sinking would be necessary after the lighter soil had been penetrated and the compact boulder stratum encountered, all well

Curbs took the form of caissons which would permit the attachment of air domes and shafts for pneumatic work. Initially, ten wells were proposed to be sunk. But after the addition of 4 spans, three more wells were added.

Position at the end of the working season 1928-29 was that sinking of 5 wells was complete. The wells were plugged, r.c pier footing and 5 6″ of pier masonry were built. The sinking of 4 more wells was in progress whereas work on the 10th well was not commenced. The characteristic feature of the season's work was the realization of the necessity for pneumatic sinking. It became evident to the contractor that opens dredging in the compact boulder stratum gave very slow progress and was in fact impossible below a certain level. Therefore by march, 1929, the contractors had obtained a pneumatic sinking set. Precaution against scour was taken by protecting wells with pitching. This was necessitated by a flood of 1929 which had caused the tilting of wells.









Monday, 10 April 2023

The history of Kalabagh Railway Bridge

 February 24, 2018

Pakistan is the proud heir to an extensive network of narrow-gauge railways inherited from the British colonial era. These railways served as crucial links, connecting various regions within the country. Originally established to facilitate the transportation of goods and essential raw materials such as coal, cotton, and wheat, these railways played a vital role in fostering economic development.

Among the remarkable railway structures from this era is the Kalabagh railway bridge, which was inaugurated on the 10th of August 1931. This bridge served as a crucial link, connecting the broad-gauge railway system on the eastern side of the Indus River to the narrow-gauge system on the western side. As a result of this significant engineering feat, a new and convenient route from Lahore to Bannu and Tank was made available, providing enhanced connectivity and transportation options for the region.

History

The construction of a bridge over the River Indus at Kalabagh marks a significant milestone in railway connectivity. This bridge will serve as a vital link between the broad gauge (5'-6") system of the North-Western Railway on the southeast side of the river and the narrow gauge (2'-6") Railway on the northwest side. It represents the first step towards converting the 2'-6" gauge Railway from Kalabagh to Bannu to a broad gauge line, with plans to extend it further to Mirali.

The bridge holds immense importance in enhancing railway communication between Punjab and Waziristan. Its completion will eliminate the need for the existing ferry system, which has inherent transportation limitations. Additionally, when combined with the completion of the bridge over the Chenab at Chiniot and the bridge over the Jhelum near Khushab, it will provide an alternative, faster, and more convenient route from Lahore to this frontier region. Furthermore, the suspended Lyallpur-Chananwala Connection will offer an additional line of communication between the frontier and Delhi.

From a commercial standpoint, the bridge is poised to play a substantial role in the development of inter-communication between the Frontier Province and the rest of India, yielding significant benefits. It is unnecessary to elaborate on its evident strategic importance.

The proposal for a bridge over the Indus at or near Kalabagh had been under discussion for several years. Initial surveys were conducted in 1888 by Mr. Ramsay, followed by further investigations and proposals by Mr. Verrier in 1919 and Col. Cowie in 1921. The idea of a Transporter Bridge, explored by Mr. Hallidy in 1923, was eventually abandoned.

An alternative proposal was considered, involving a combined Weir and Railway Bridge. However, this plan was rejected partly due to uncertainty regarding the sanction for the Thal Canal Project, of which the Weir formed a part. Moreover, the chosen site allowed for a shorter crossing of 2,500' instead of a longer 4,500' crossing at the proposed location.

Finally, in 1927, a project for a bridge with an estimated cost of Rs. 40:36 lakhs was submitted to the Railway Board and received approval in May of that year. The bridge consists of nine girders spanning 250' with a clear distance of 263' between piers. These girders, adhering to the standard M. L. of 1926, are designed to accommodate a single broad-gauge railway line. Considering the absence of road communications, no provision has been made for roadways.

Site.

The chosen location for the bridge lies approximately one mile downstream from the point where the Indus River emerges from the gorge and enters the plains. It is positioned just below Mari Ghat, the current ferry terminus, and immediately after the convergence of the Nihal Shah Nullah. This site offers a stable course for the river, eliminating the risk of upstream meandering due to the presence of surrounding hills that define its path. Moreover, the geographical configuration of the surrounding area prevents the river from forming loops and flowing back close to the bridge approaches.

This favorable condition ensures the long-term stability of the river channel and simplifies the task of securing the bridge approaches. Additionally, the chosen site possesses the added advantage of facilitating the alignment of the approaches. It effectively avoids numerous graveyards, particularly on the Kalabagh side, as its position enables easy avoidance of these areas without complications.